How to Install Wet Pour Rubber

A step-by-step DIY guide to laying a wet pour rubber crumb surface.

Wet pour rubber being laid in a playground

Tools you may require

  • Forced action pan (paddle) mixer
  • Wheelbarrow
  • Light roller
  • Trowels
  • Measuring jug and funnel
  • Straight edge
  • Depth block
  • Bucket
  • Gloves
  • Washing-up liquid

DownloadHow to Install Guide in PDF format

Rubber shockpad close-up

Playgrounds & fall zones

Need softfall padding under your wet pour?

Laying wet pour under play equipment? Our rubber shockpads go underneath to give a softer landing. The higher the possible fall, the thicker the pad you’ll need. You’ll find pad thicknesses and our fall height guide on the shockpads page.

View rubber shockpads →

☎

Not sure what you need? Give me a call and I’ll help you work it out.
Call Glen – 0481 882 137

Wet pour rubber DIY instructions

Guidance for the installation of Wet Pour Rubber Crumb

Rubber Crumb products have been developed to work with our PU Binder and laid as a continuous wet pour surface.

If you are unsure of the depth of surface required to meet any fall height regulations or recommendations, please contact us and we will advise you.

Wet Pour Rubber Crumb can be laid on existing solid surfaces such as bitumen or concrete, but you must ensure that there is good drainage. We do not recommend laying directly onto unprepared surfaces such as bare soil or grass. If the area you intend to use is currently soil, grass or another unmade surface, then we strongly advise that a sub-base of a minimum of 100 mm of a compacted aggregate, such as crusher dust/cracker dust, should be laid first, with a geotextile membrane laid on top to inhibit weed growth.

  1. 1A firm edging should be installed around the perimeter of the area, using either treated timber or other permanent edging.
  2. 2Wet Pour Rubber Crumb should not be laid in damp or cold conditions; 5°C is the minimum temperature advised. Our PU Binders are moisture-activated, and any contact with moisture, either through rainfall or existing damp surfaces during installation, will cause the binder to react and cure much more quickly, resulting in potential problems with the finished surface. Check there is no rain forecast for at least 48 hours from when you start the installation.
  3. 3The depth of the top layer is usually 15 mm minimum +. To mix the Rubber Crumb and Binder, it is common practice to use a forced action pan or paddle mixer, which are widely available for hire on a daily or weekly basis.
  4. 4For the top layer, we recommend a mixture ratio of 4 kilos of Binder per 25 kilos of Rubber Crumb.
Show all 9 stepsShow fewer steps
  1. 5When you’ve prepared the sub-base, you can begin mixing the crumb and binder. Allow the material to mix for between 4–6 minutes per batch. Reducing this mixing time will result in the surface taking much longer to set; however, leaving it mixing too long will make it more difficult to spread, so this timing is critical. When the batch has been mixing for the correct length of time, empty it from the mixer into a wheelbarrow and take it immediately to the site to be poured out and laid.
  2. 6The mix should be trowelled evenly over the area to the required depth using a depth block and straight edge, then lightly rolled to ensure a level surface. As the rubber crumb is very adhesive at this point, we advise continuously lubricating your trowels and rollers with ‘soapy’ water/trowel lubricant or diesel fuel.
  3. 7We recommend that you coat the edging boards with a layer of binder as you work up to them with the rubber crumb. This will help to create a strong adhesion between the finished surface and the edging.
  4. 8White spirits may be used to clean your tools once you’ve finished.
  5. 9The area should be ready to walk on within 24 hours, but we recommend it not be used for 72 hours after completion.
READY TO GO?

Order your wet pour rubber here

Pick your colour, enter your area and get your quantities instantly. Then lay it yourself with this guide.

  • Choose your colour online
  • Instant quantity calculator
  • Help from Glen on 0481 882 137

Order your rubber now →

Installation videos

Need help?

Call our expert, Glen, directly on 0481 882 137

Call Glen now